BOARDROOM CEILING & HVAC REPAIRS

Our client needed to upgrade the HVAC system in a tenants occupied boardroom. This required extensive prep and protection to ensure no damage to there high-end furniture, and also to be completed after hours to avoid any downtime for the tenant.

 

• Supplied and installed poly walls and a zipper door to contain dust during the renovation.

• Supplied and installed comprehensive dust cover and protection for all furniture and floors.

• Supplied air scrubbers to contain dust and debris.

• Custom built movable platforms to accommodate for ceiling work, and to insure no work was done on the boardroom table.  

• Demoed and disposed of existing ceiling.

• Re + Re HVAC ceiling system.

• Reinstalled drywall ceiling with new access hatches.

• Painted new ceiling.

• Completed project without any disruption for the tenant.

© 2020 by Sierra Projects Inc.

All content on this website is the exclusive property of Sierra Project Inc, and cannot be reproduced or copied without the written consent of Sierra Project Inc. 

  • Facebook - White Circle
  • Instagram - White Circle
  • Twitter - White Circle
  • LinkedIn - White Circle